13 open federal solicitations with a place of performance in South Carolina. Narrow it to your trade, or get the weekly digest for your trade and state.
The purpose of this acquisiton package is to replace an aging AHU to restore reliable, code-compliant environmental control; reduce operational and contamination risk; maintain environmental stability; and ensure…
The purpose of this acquisiton package is to replace an aging AHU to restore reliable, code-compliant environmental control; reduce operational and contamination risk; maintain environmental stability; and ensure…
The purpose of this acquisiton package is to replace an aging AHU to restore reliable, code-compliant environmental control; reduce operational and contamination risk; maintain environmental stability; and ensure…
Login at https://piee.eb.mil and search for 'N4008526R0187' to obtain more details.*
Login at https://piee.eb.mil and search for 'N4008526R0187' to obtain more details.*
The Contractor shall furnish all labor, supervision, materials, equipment, tools, transportation, permits (as required), and incidentals necessary to remove three (3) existing ADA security portals located within the…
Work performed consists of minor site development, construction of concrete water diversion curbing, interior renovations to lighting, HVAC, doors, roofing, doors and entry gate operators.Contractor shall provide all…
The work to be performed consists of the removal of a non-essential low point drain from a three (3) inch condensate line and the replacement and addition of seismic bracing of the condensate line. Contractor shall…
Work performed consists of the replacement of two (2) failing rooftop packaged air conditioning units (RTU-1 and RTU-2) with modern, high-efficiency, "like-in-kind" units at Building 3852. Additionally, this project…
Remove safety hazard of unsupported masonry walls in multiple locations on Joint Base Charleston, Air Base and Naval Weapons Station. The work to be performed consists of furnishing all tools, qualified labor,…
Solicitation Number: 70LCHS26QPFB00034 Amendment 0001 Amendment 0001 Includes: 1) New Bid Option CLIN for B1 Roof 2) Attachments 15 - 17 3) Changes RFI Response Due date to 8/28/2026 This is a combined…
Project 534-24-706 EHRM Data Center Upgrades - Charleston, SC Amendment 0001 issued 8/3/2026 Amendment 0002 issued 8/10/2026 Amendment 0003 issued 8/26/2026
This is a construction requirement for the repair of the Fire House Kitchen B708.Period of Performance: 90 Calendar Days after Notice to Proceed issuance. Competition: This requirement is a 100% Small Business…